Canal Design Calculator: Flow, Depth, Scour Check & Lining Payback
Enter a flow to get the water depth, or enter a depth to get the flow. Then check scour and silting, find the most efficient section, and see earthwork cost, seepage loss and whether concrete lining pays back. Free, worldwide, any currency.
1. Canal & Lining
2. Project & Money
Earthwork & lining prices
Stage-Discharge Table
| Depth | Flow | Velocity | Froude | Status |
|---|
Canal Hydraulic Design Guide
A good canal carries the design flow without eroding its bed, silting up or wasting water. This tool checks all three with a few inputs, then prices the earthwork and the water you lose through seepage.
Equations Used (SI)
Q = (1/n) · A · R2/3 · S1/2 (US units: 1.486/n)
A = (b + z·y)·y, P = b + 2y√(1+z²), R = A/P
Froude Fr = V / √(g · A/T), T = b + 2zy
Bed shear (max) ≈ 0.97 · γ · y · S, γ = 9810 N/m³
Best section: R = y/2, b = 2y(√(1+z²) − z)
Freeboard (USBR rule): F = √(C·y), C = 1.5 to 2.5 (feet), rising with flow
Seepage loss = rate × wetted perimeter × length × days
Depth for a given flow is solved numerically from Manning’s equation. Permissible shear and velocity for soils are classic clear-water values and are conservative guides, not guarantees, since real limits depend on soil compaction, sediment load and side-slope angle. Seepage rates (concrete about 0.03, clay loam about 0.2, sand or gravel about 0.55 m³ per m² per day) are typical planning values. Measure your own for important decisions. Freeboard, earthwork volumes and lining area assume full excavation to the design depth plus freeboard. Roughness n for earth channels changes with weeds and age, so test a higher n for safety.
FAQ
What Froude number is safe? Keep Fr below about 0.8. Near 1 the flow becomes unstable with waves, and above 1 it is supercritical and erodes more.
What if the velocity is too low? Below roughly 0.4 m/s sediment settles and weeds grow. Increase the slope or narrow the section.
Why compare with the efficient section? It uses the least wetted perimeter for the same flow, so lining costs less, although it may be deeper than practical on site.
© AgroEngineeringZone.com — Results are planning estimates only, based on common Manning and canal-design practice and your own inputs. They are not a substitute for professional engineering design or local standards. AgroEngineeringZone.com is not liable for decisions made using this tool.